650 pcs Railway Tyres — SGS Inspected
Customized railway tyres manufactured according to customer drawings and technical requirements, with SGS third-party inspection covering dimensions, hardness, marking, visual quality, packing and documentation before shipment.

Project Overview
Kingrail coordinated the supply of 650 customized railway tyres manufactured according to the customer's drawing and technical requirements. The project included SGS third-party inspection covering quantity, marking, packing, visual quality, dimensional verification, hardness testing and MTC review before shipment.
- Product
- Railway Tyres
- Quantity
- 650 pcs
- Outside Diameter
- 914 mm
- Inside Diameter
- 736 mm
- Tyre Width
- 116 mm
- Hardness Requirement
- 285–320 HB
- Inspection
- SGS Third-Party Inspection
- Manufacturing Basis
- Customer drawing and technical requirements
Railway Tyres Manufactured to Project Requirements
Railway tyre projects require confirmation of dimensional requirements, profile, material specification, hardness, machining and inspection criteria before production. Manufacturing was coordinated according to the customer drawing and confirmed technical requirements.

Confirmed Project Requirements
SGS Inspection Before Shipment
SGS performed third-party inspection for this railway tyre order before shipment. The inspection scope included quantity verification, product marking, packing, visual quality, dimensional measurement, hardness testing and review of the material certificate.



Dimensional Verification
A sample of railway tyres was selected for dimensional inspection under SGS witness. Outside diameter, inside diameter and tyre height were checked against the project drawing requirements.
Inspection tolerances and acceptance criteria were based on the project drawing.

Hardness Verification
Hardness testing was performed under SGS witness as part of the agreed inspection scope.
The inspected samples were recorded as meeting the specified hardness requirement.

Prepared for International Shipment
After inspection, the railway tyres were packed and prepared for international shipment according to the project packing requirements.